Impact moling is a trenchless way to lay a new pipe without digging up the surface above it. A pneumatic 'mole' hammers itself horizontally through the ground between two small pits, pulling a new water pipe behind it — no open trench across lawns, patios or tarmac.
WaterTrust Approved — every contractor is identity-checked with accreditation and insurance verified before they can quote.
What the work involves
- Launch and reception pits at each end of the run
- A pneumatic mole driven along the planned line and depth
- New MDPE pipe drawn through in the same pass
- Pit reinstatement — the surface between them untouched
When you need it
- Replacing a supply under a driveway, path or established garden
- Crossing where excavation would be slow or expensive to reinstate
- Runs up to ~20m per shot in suitable soils
- Any job where the surface above must not be disturbed
What impact moling costs in Street
Moling typically prices at £60–£150 per metre plus the launch and reception pits at each end. Ground conditions, pipe diameter and reinstating the two pits — especially in paved surfaces — move the number; connection work at each end is often the larger cost, so check what the metre rate includes.
When moling wins
Moling almost always wins under driveways, paths and established gardens, because open-cut trenching pays twice — once to dig and once to reinstate. Under a plain lawn, compare quotes: short excavations can compete. And for longer or curved runs — under roads or whole gardens — a related steerable technique, horizontal directional drilling, is used instead; quotes name whichever fits. Very short runs, congested ground and some soils rule moling out, which contractors confirm before quoting the method.
How the work proceeds
The sequence on the day: two pits are dug at the launch and reception points; the mole is aligned and driven, hammering a bore between them; the new MDPE pipe is drawn through behind it; connections are made at each end; and the pits are backfilled and reinstated. A typical house-length run is completed in a day.
Get quotes for impact moling in Street
Local water facts for Street
Water supply: Bristol Water · www.bristolwater.co.uk · 0345 702 3797
Wastewater & sewers: Wessex Water
Postcode districts covered: BA16, BA6, TA11, BA5
Water hardness: Hard (High limescale risk). Scale from hard water builds up inside supply pipework and appliances over time, which is worth knowing when repairing or replacing pipe.
Most properties in Street are supplied by Bristol Water, although this can vary by postcode. Wastewater is typically handled by Wessex Water. Water hardness in Street is typically Hard (High limescale risk). Common local postcode districts include BA16, BA6, TA11 and nearby districts.
Who owns which pipe in Street: the supply pipe from the boundary stopcock into the property belongs to the property owner; the water main in the road and the communication pipe up to the boundary belong to Bristol Water. Contractors on WaterTrust handle the private side — for a fault on the company's side, report it to Bristol Water instead of paying anyone.
Impact Moling in Street — common questions
What ground suits moling?
Clay and most firm, settled ground mole well. Very loose sand, waterlogged ground or heavy rubble/rock can deflect the mole — your contractor assesses on survey.
Can every pipe be moled?
No — congested ground with other services, very short runs and some soil types rule it out. Feasibility is confirmed before the method is quoted.
Does the metre rate include connections?
Often not — the rate usually covers the bore and pipe, with connections, fittings and any water company work at the boundary as separate lines, so ask what is included.
Who is responsible for this work in Street?
The supply pipe from the boundary stopcock into the property belongs to the property owner; the water main in the road and the communication pipe up to the boundary belong to Bristol Water. Contractors on WaterTrust handle the private side — for a fault on the company's side, report it to Bristol Water instead of paying anyone.
How do quotes work on WaterTrust?
You post the job once, free, with no account needed. Up to 4 vetted contractors covering Street and the surrounding villages contact you with quotes — you are never charged. You deal with the contractor directly — WaterTrust makes the introduction; it never resells or subcontracts your job.
Ready to get quotes?
Post the job free in about a minute. Up to 4 vetted contractors reply with quotes — no obligation.
You may also be interested in
Impact Moling nearby: Glastonbury · Wells · Bridgwater · Yeovil · Taunton
Read more: Impact Moling overview